Skip to content
ARB-ZONE logo
08Service

Construction Estimation

Accurate material and labour estimates for every project phase.

Construction cost overruns start with underestimated scope. Every missing line item, every assumed quantity, every optimistic labour hour compounds into budget pressure by mid-build.

We break down your plans into a complete bill of quantities, price it against current market rates, factor in waste and regional labour costs, and present the number with every assumption itemised. The estimate is detailed enough to bid with, negotiate with, or schedule against.

You probably need this if

  • 01Previous projects consistently ran over budget
  • 02You need a detailed estimate for financing or tendering
  • 03Plans are ready but the numbers aren't adding up
AApproach

How we run this work.

01

Complete material takeoff

Quantities measured from architectural, structural, and MEP drawings. Every fixture, fitting, lineal metre and cubic metre counted, with waste factors per material type.

02

Current market pricing

Material costs sourced from suppliers in your region, updated for the month you are building in. Labour rates reflect local market conditions, union vs. non-union, and prevailing wages where they apply.

03

Risk and contingency separated

Base cost, escalation, and contingency are separate line items. You see what is known, what could shift, and what buffer covers the unknowns — including soil conditions, permit delays, and design changes.

BDeliverables

What you actually receive.

Not a summary of activity. These are artefacts that exist, that you own, and that another engineer could pick up.

01Complete bill of quantities from drawings
02Material and labour cost breakdown by trade
03Equipment, site preparation and temporary works
04Permit, inspection and testing fees
05Contingency and escalation allowances
06Value engineering recommendations
07Cost comparison across build methods or phasing options

Typical stack

Chosen per project against your constraints, your team’s existing skills and what you already run in production — never from habit.

Bluebeam RevuPlanSwiftAutoCADRevitExcelRSMeansLocal supplier databasesRegional labour indices

Next step

Send a short brief and we will come back with a cost range for exactly this scope, plus the assumptions behind it.

Get an estimate
Construction Estimation

Ready to scope your construction estimation work?

Two lines about the problem is enough. You will get a range, the assumptions it rests on, and a recommendation on how to phase it.

REPLY
within one business day
ARB-ZONE, 7901 4th St N, 34590, St Petersburg, FL 33702